Meeting 2009-03-31
Administrative and budgeting meeting
Mechanical
- All 6 motors and gearboxes have been installed
- One internal frame needs machine shop work
- Will be manufacturing the 6 hubs necessary
- Hopefully will be rolling this weekend or Monday
- Still need to install the mast
- Performed miscellaneous odd jobs for the electrical team
- Mast has been screwed together -- now ready to run
Electrical
- 3 boards manufactured last week
- Low power distribution ("Molex board")
- Kill board
- Motor controller
- Have laid out the power distribution shelf
- Need to finish routing the wires
Software
- Progress on image processing
- Machine learning stuff added for
- Worked on upgrading Elphel firmware; will do that tomorrow
- Took calibration images with the mounted camera
Misc
- Worked on the SGA budget